_________________________________________________________________

Slides:



Advertisements
Liknande presentationer
Aktuella prospekt Företagsetableringar 7 september 2011
Advertisements

1.Numerical differentiation and quadrature Discrete differentiation and integration Ordinary.
Vägledningscentrum Career guidance centre
OWN LOGO CREATING THE MOBILE FUTURE Erik Stenberg, 14 Oktober 2009.
Göteborgsregionens kommunalförbund: Ale|Alingsås|Göteborg|Härryda|Kungsbacka|Kungälv|Lerum|LillaEdet|Mölndal|Partille|Stenungsund|Tjörn|Öckerö Gothenburg.
För att uppdatera sidfotstexten, gå till menyfliken: Infoga | Sidhuvud och sidfot Fondbolagsträff 2015.
Exempelbaserade specifikationer med SpecFlow
Hållbart Nyföretagande/ CSR som värdegrund 14:15-16:50.
Public Participation and Dialogue in Road-Planning and Road-Design Example: Bypass Norrtälje Suzanne de Laval SWEDEN.
Förr och nu Från innan GCP till Business Compliance Peter Jansson, AstraZeneca.
System arbetssystem informationssystem
Samordning inom EU Statusrapport från arbetet inom EUs Expert Grupp för elektroniska fakturor Leif Karlsson Chef Betalningar.
Potential of hardwood Europeiska Unionen Utvecklings- och garantifonden för jordbruket Cooperation fair, Brussels in June 2005.
A Jump for a Sustainable Future ”Jump” and ”Hope” have the same meaning in swedish.
”National Champions” Nordiska konkurrensnätverket Bergen 2008 Hans Henrik Lidgard.
CHARTS Interreg IVC KULTURFORUM 23 NOVEMBER 2012 Tomas Olsson.
DIS 9001:2008 Vilka förändringar kommer i nya standarden Gabriel Bosaeus.
Engineering in Spain Visit of Swedish Delegation Narciso García Escuela Politécnica Superior Universidad Autónoma de Madrid Bilaga.
Mathematics 1 /Matematik 1 Lesson 5 – experimental data and their models Lektion5 – experimentell data och deras modeller.
To practise speaking English for 3-4 minutes Genom undervisningen i ämnet engelska ska eleverna ges förutsättningar att utveckla sin förmåga att: formulera.
© Gunnar Wettergren1 IV1021 Project models Gunnar Wettergren
NOTIS – Ökad arbetslivsanknytning i utbildningen
1-1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1-1 Programmering 7.5 hp Programmering är... creativ, fascinerande, roligt,
Shannon dekomposition
Farofyllda vägar Annika Winsth Economic Research September 2015.
Don´t just try! Do! Emma Nääs
CLEANTECH BUSINESS NETWORK SUSTAINABLE BUSINESS HUB OvV7T9HMvgxt1i_WrSJ4jOXD0Lg4F3WS4.
Oroligt och riskfyllt 1. Hygglig tillväxt trots allt 2.
Advice from Bronx Best Real Estate Attorney. Jagiani Law office of New York has been successfully working as divorce attorney & Real estate attorney for.
Digitization and Management Consulting
Why you should consider hiring a real estate attorney!
Samarbete, nyckelfaktor för framgång inom havsbaserad vindkraft
Acknowledgements to Fritz Wagner.
GDPR - General Data Protection Regulation
Undervattensmatematik på Minesto
Grants office inforMation
Utmaningar i interkulturell distansutbildning
@GreaterCph #GreaterCph
Bringapillow.com. Online Dating- A great way to find your love! The words ‘Love’ and ‘Relationship’ are close to every heart. Indeed, they are beautiful!
Work of a Family law attorney Jagianilaw.com. A Family Law Attorney basically covers a wide range spectrum of issues that a family may face with difficulty.
Meeting singles had never been so easy before. The growing dating sites for singles have given a totally new approach to getting into relationships. ‘Singles.
Planering i matematikundervisning
Waste management on export
Strategic Sustainable Development
The passive voice For the 8th graders.
Formal Languages, Automata and Models of Computation
Union of the Baltic Cities Meeting of the Executive Board Växjö
My role model.
Svarsfrekvensen i undersökningar från webbpaneler. Några resultat
How to Buy Engagement Rings for Women Online?. Buying engagement rings for women or tiffany celebration rings from the online market could be a bit challenging.
You Must Take Marriage Advice to Stop Divorce! Dontgetdivorced.com.
WindEurope Summit 2016, Hamburg
Feeder bus line – batteryoperated with induction charging
Tjänstemännens makt och inflytande i lokal miljöpolitik
Vattenfalls Idrotts- & Fritidsförbund
Kvilldal HVDC Station ABB AB, Power Grids, © ABB Group
The Swedish Forest-based Sector Research Agenda …
The Swedish charge on emissions of nitrogen oxides
Framgångsrecept för samverkan
Välkommen till företagsledarnätverk!
Xxx skolans/universitetsförvaltningens miljöledningssystem Möte ÅÅMMDD
Accounts + SD = ♥? SD indicators generated from an integrated statistical account New report financed by Eurostat, DG Environment and Statistics Sweden.
The “MiGreat Project”- n
Reporting of indicators i Sweden step by step
WG D – feedback WFD reporting - SWEDEN
The Swedish MSP process “The future we want” Better together
TRAFFIC EMISSION DUE TO WASTE Collection in Stora Ursvik, Stockholm
Packaging that makes life easier!
Presentationens avskrift:

0950-699 799 | kontakt@garantia.se | www.garantia.se _________________________________________________________________ Från bygdepeng till mångdubblade utvecklingsmedel – en ny modell Stöd till lokal utveckling 0950-699 799 | kontakt@garantia.se | www.garantia.se

Blakliden / Fäbodberget 353 MW i SE2 Vattenfalls största landbaserade vindkraftsprojekt Fäbodberge t Blaklide n Stor-Rotliden Nyckelfakta Projekt utvecklade av Vattenfall Lokaliserade i Åsele och Lycksele kommuner Sveaskog och cirka 30 privata markägare Medelvind: 7,7 m/s 84 vindkraftverk 136 m rotor 112 m tornhöjd Maxeffekt: 353 MW Produktion: 1,1 TWh Servicecenter i Fredrika Saminvestering mellan Vattenfall, Vestas & PKA www.vattenfall.se/blaklidenvind www.vattenfall.se/fabodbergetvind Vindkraftparken består av två områden; Blakliden i Åsele kommun med 50 kraftverk och Fäbodberget i Åsele och Lycksele kommuner med 34 kraftverk. Den totala kapaciteten kommer att bli 353 MW vilket är tillräckligt mycket förnybar energi för att kunna förse 220 000 svenska hem med hushållsel. - Det är mycket glädjande att vi nu kan fortsätta vår expansion av landbaserad vindkraft i Sverige. Med Blakliden/Fäbodberget tar vi ett betydande steg i vår strategi att bli fossilfria inom en generation och denna gång gör vi det ihop med starka partners i form av Vestas och PKA, säger Magnus Hall, VD och koncernchef Vattenfall. Application sent to authorities in December 2012. Permit allowing for 13 WTG with fully flexible positions and up to 201 m tip height. Vattenfall green field development in Lycksele, and Åsele municipalities Average wind speed: 7.7 m/s at 114 m hub height 350 MW, 84 WTGs Capacity factor: 36% Distance to grid connection Blakliden 25 km and Fäbodberget 35 km Distance to service hub in Fredrika 35 km Grid Investment Decision taken in November 2017. BA Wind committed to ~30 MEUR grid connection agreement. For Fäbodberget, the environmental permit according to the Swedish Environmental Act was issued by the County Administrative Board of Västerbotten in 2014, and gained legal force in September 2016. The permit is valid for 35 years from when it gained legal force, i.e. until September 2051.   For Blakliden, the environmental permit was issued by the County Administrative Board of Västerbotten in 2013, and gained legal force in September 2015. The permit is valid for 35 years from when it gained legal force, i.e. until September 2050. Under the terms in the permits, the Wind Farm is restricted to a total of 90 turbines (of which 84 turbine positions are planned) and a maximum tip height of 180 meters. The permits do not contain any limitations regarding installed capacity. The permits allow for free placing of turbines within the project areas (box model), with respect to given restrictions within the permitted area regarding nature values, hydrology and cultural heritage remains. Standard terms regarding noise and shadow flicker apply. GRID Internal 33 kV cabled collection grids connect the turbines to three onsite transformers, one for each site area. Transformers then connect via an approximately 19 km long 150 kV overhead line to the 400 kV national grid via a new transformer station in Norrtjärn. The total capacity is limited to 353 MW for the Wind Farm. Vattenfall Eldistribution is the connecting utility and is responsible for the planning and construction of the external grid connection and for the interface towards SvK, the Swedish TSO. Vattenfall Eldistribution has obtained the necessary line concessions, in total three, for the connecting grid. The first concession gained legal force in [•], the other two are expected to do so during [•].

Blakliden / Fäbodberget tankar om stöd till lokal utveckling Utvecklade idé för att maximera effekten Vattenfall har givit stöd till lokal utveckling i flera projekt med fokus på föreningsliv För att maximera nyttan har vi tänkt att även näringslivet bör inkluderas Efter interna diskussioner och värdefulla samtal med Vindkraftcentrum hittade vi Garantia som den perfekta samarbetsparten Vi har kommit fram till en lösning som vi gärna vill återanvända framöver Vindkraftparken består av två områden; Blakliden i Åsele kommun med 50 kraftverk och Fäbodberget i Åsele och Lycksele kommuner med 34 kraftverk. Den totala kapaciteten kommer att bli 353 MW vilket är tillräckligt mycket förnybar energi för att kunna förse 220 000 svenska hem med hushållsel. - Det är mycket glädjande att vi nu kan fortsätta vår expansion av landbaserad vindkraft i Sverige. Med Blakliden/Fäbodberget tar vi ett betydande steg i vår strategi att bli fossilfria inom en generation och denna gång gör vi det ihop med starka partners i form av Vestas och PKA, säger Magnus Hall, VD och koncernchef Vattenfall. Application sent to authorities in December 2012. Permit allowing for 13 WTG with fully flexible positions and up to 201 m tip height. Vattenfall green field development in Lycksele, and Åsele municipalities Average wind speed: 7.7 m/s at 114 m hub height 350 MW, 84 WTGs Capacity factor: 36% Distance to grid connection Blakliden 25 km and Fäbodberget 35 km Distance to service hub in Fredrika 35 km Grid Investment Decision taken in November 2017. BA Wind committed to ~30 MEUR grid connection agreement. For Fäbodberget, the environmental permit according to the Swedish Environmental Act was issued by the County Administrative Board of Västerbotten in 2014, and gained legal force in September 2016. The permit is valid for 35 years from when it gained legal force, i.e. until September 2051.   For Blakliden, the environmental permit was issued by the County Administrative Board of Västerbotten in 2013, and gained legal force in September 2015. The permit is valid for 35 years from when it gained legal force, i.e. until September 2050. Under the terms in the permits, the Wind Farm is restricted to a total of 90 turbines (of which 84 turbine positions are planned) and a maximum tip height of 180 meters. The permits do not contain any limitations regarding installed capacity. The permits allow for free placing of turbines within the project areas (box model), with respect to given restrictions within the permitted area regarding nature values, hydrology and cultural heritage remains. Standard terms regarding noise and shadow flicker apply. GRID Internal 33 kV cabled collection grids connect the turbines to three onsite transformers, one for each site area. Transformers then connect via an approximately 19 km long 150 kV overhead line to the 400 kV national grid via a new transformer station in Norrtjärn. The total capacity is limited to 353 MW for the Wind Farm. Vattenfall Eldistribution is the connecting utility and is responsible for the planning and construction of the external grid connection and for the interface towards SvK, the Swedish TSO. Vattenfall Eldistribution has obtained the necessary line concessions, in total three, for the connecting grid. The first concession gained legal force in [•], the other two are expected to do so during [•].

0950-699 799 | kontakt@garantia.se | www.garantia.se _________________________________________________________________ 2004 650 företag satsar 5000 SEK var och bildar föreningen 2005 Registreras av Finansinspektionen 2005-2017  509 beslutade garantier till garantivärdet 144 milj SEK och lånevärde 808 milj SEK. 2016 Godkänd som intermediär av EIF Europeiska investeringsfonden. Mikroborgen, återförsäkrad hos EIF. 2017-2018 Nya varumärket Garantia. 0950-699 799 | kontakt@garantia.se | www.garantia.se

0950-699 799 | kontakt@garantia.se | www.garantia.se _________________________________________________________________ Saknas: Riskvilligt lånekapital Finansiering av mindre krediter Kompetens som försvann då banken stängde kontoret 0950-699 799 | kontakt@garantia.se | www.garantia.se Det här fotot av Okänd författare licensieras enligt CC BY

0950-699 799 | kontakt@garantia.se | www.garantia.se _________________________________________________________________ NY MODELL Att ersätta årlig utbetalning till engångsutbetalning vid investeringens start Att användas till marknadskompletterande lånefinansiering kombinerad med rådgivning Ger mångdubblad effekt då pengarna kan återanvänds 0950-699 799 | kontakt@garantia.se | www.garantia.se

0950-699 799 | kontakt@garantia.se | www.garantia.se _________________________________________________________________ 0950-699 799 | kontakt@garantia.se | www.garantia.se

Tack! 2018-12-31 Confidentiality – None (C1)