Ladda ner presentationen
Presentation laddar. Vänta.
1
sammanträde med styrelsen
Linneaus Center ACCESS Autonomic Complex Communication nEtworks, Signals and Systems sammanträde med styrelsen Tisdag den 25 november 2008, kl Osquldasväg 10, plan 8
2
Sammanträde med styrelsen Dagordning
Föredragningslista Utseende av justeringsman Föregående mötesprotokoll, bifogas Information Nya projekt Pilotprojekt - VINNOVA/VR Postdocs Gästforskare Forskarskolan Workshops DLS Nya hemsidan Kommunikationsplan SAB mötet ACCESS projekt – status rapport Budget 2009 Ny föreståndare Övrigt Nästa möte
3
3. Föregående mötesprotokoll
ACTION ITEMS (AI): Invite additional SAB member Ottersten Plan SAB meeting Ottersten Postdoc call Ottersten System for better project overview and project proposals Ottersten
4
4. Information – Project Overview
Funding Agency Number of Projects Funding Volume 2008 VR 13 10431 VINNOVA 9 10069 SSF 2 2450 EU FP6 6 4330 EU FP7 7 7100 Ericsson 3 1170 Other 2000 Total 42 37550
5
4. Information – New Projects (2009)
SSF (Programvaruintensiva system 2008) RESOURCE ALLOCATION AND MULTINODE COOPERATION IN RADIO ACCESS NETWORKS (RAMCOORAN) KTH (M. Skoglund and M. Johansson), LiU (E. G. Larsson) and Ericsson Research (M. Prytz) 20 MSEK – 5 years Promos - wireless sensor network programming made easy SICS (A. Dunkels, PI; T. Voigt) and KTH (M. Johansson) 26 MSEK – 5 years
6
4. Information – New Projects (2009)
Vetenskapsrådet Informationsteori för Reglering över Nätverk, Fo.ass. 4216 kSEK, 4 years Grundläggande spörsmål för radiofrekventa signaler och system, P. Händel 1920 kSEK, 3 years Teori och ingenjörsmetodik för design av skalbara mekansimer för resursoptimering i nätverk, M. Johansson 2250 kSEK, 3 years Metoder för Adaptive Källkodning, B. Kleijn 2700 kSEK, 3 years
7
4. Information – New Projects (2009)
Vetenskapsrådet Ett geometriskt angreppssätt baserat på global analys till problem inom system- och reglerteori, A. Lindquist 2250 kSEK, 3 years Samarbetande sensor- och transmissionstekniker, M. Skoglund 3600 kSEK, 3 years Effektiva rate-lösa koder för trådlös kommunikation, Fo.ass. 4316 kSEK, 4 years
8
4. Information – Pilot Project Proposal
VINNOVA – VR cooperation Innovationsprogram för svensk grundforskning- Pilot 2009 1 year, 670 kSEK
9
4. Information - Postdoc Positions
18 April – Call opened 30 May – Application deadline 13 June – Labs forward candidates 17 June – decision by EC 3 existing postdocs renewed for 1 year B. Shankar, M. Xiao, D. Dimarogonas 2 new postdocs employeed C. Royas, T. Oechtering
10
4. Information – Guest Researchers (2008)
Longer visits (supported with 40kkr/month) Beom Jun Kim – 12 months, 6 months supported by ACCESS, host computational biology T.V. Sreenivas – Extension granted 3+2 months, host SIP Ana Perez – 6 months, host signal processing (decision by EC pending) Shorter visits (supported by giving short courses) Zhinxin Liu Christopher Byrnes – 2 months, host sys. & opt. Vikram Krishnamurthy – 2 months, host control
11
4. Information – Graduate School
Spring 2008 Nonlinear Systems: Analysis and control, Preparatory course Xiaoming Hu Physics of distributed information systems, Intensive course/workshop Erik Aurell (coordinator) Stochastic Estimation and Control, intensive course Vikram Krishnamurthy Summer School on Entrepreneurship (with the GST)
12
4. Information – Graduate School
Fall 2008 The generalized moment problem and rational measures, Intensive course Christopher Byrnes Introduction to model order reduction, specialized course Henrik Sandberg WSN programming, intensive course, cooperation SICS, ACCESS Global navigation satellite systems, specialized course, P. Händel Spring 2009 Bayesian networks
13
4. Information - Workshops
EU – US workshop 16 June, 2008 Networked information and control systems Jointly organized with CITRIS (UC Berkeley) and EC ICT FP7 Keynote presentations: Ruzina Bajcsy, UC Berkeley Björn Gudmundsson, Ericsson Steven Glaser, UC Berkeley
14
4. Information - Workshops
2008 ERNSI Workshop in System Identification October 1-3, 2008 ACCESS PhD Student Workshop March 3, 2009 Proposal for Cyber Physical Systems Week 2010
15
4. Information Distinguished Lecture Series
May: Ozalp Babaoglu, Univ. Bologna June: Vikram Krishnamurthy, Univ. British Columbia August: Chris Byrnes, Washington Univ. September: Radia Perlman, SUN Microsystems November: Amir Averbuch, Tel Aviv Univ. December: Jerome Sgard, Science-Po Univ., Paris
16
4. Information – ACCESS WWW site
17
4. Information – Communication Plan
Consulting Firm - Nordisk Kommunikation BACKGROUND AND GOALS: 3 February TARGET GROUPS: Wednesday 4 March RESULTS AND GOALS: Wednesday 18 March, MESSAGE: Wednesday 25 March,
18
5. Scientific Advisory Board Meeting
October 1, 2008 P.R. Kumar, University of Illinois Martin Vetterli, EPFL Radia Perlman, Sun Fellow and honorary doctor of KTH
19
Strengths ACCESS has the potential to be world leading in communication networks and systems, and is already among the top in Europe Excellent graduate program with an impressive list of PhD courses Very strong international exchange program, but improve in attracting postdocs from top (US) universities
20
Weaknesses Joint research goals and challenges weakly communicated
World class research achievements not well presented, cf., GIPS/Skype Should investigate also in something that is a wild bet, be more precise on which problems you are scratching the surface and where you are deep
21
Suggestions Be more ambitious with the vision and highlight achievements better Develop a focus scenario that can act as a unifying research problem in internal and external communication of ACCESS, e.g., Green ICT Improve lab facilities, particularly with co-located PhD students Set up controversial panels where you teach industry about the themes in seminars and workshops
22
6. ACCESS Projects – Status Report
Traffic Control, Ulf Jönsson, PI Wireless Sensing and Actuation, Karl-Henrik Johansson, PI Active Estimation Håkan Hjalmarsson, PI Radio Resource Management, Mats Bengtsson, PI MOBBESKAJP Victoria Fodor, PI MONITOR, Mads Dam, PI
23
7. Verksamhet och Budget 2008 Management & Adm 2008 Budget
2008 Estimate Personnel 925 625 OH (HSG, Offices, IT, EE OH) 450 140 Lecture series 100 40 Workshops 400 Total 1575 1205
24
7. Budget 2009 Income 2008 2009 Previous year 6.250
( ) VR 11.150 Faculty funding 2.200 Total 19.600 16.050 Expenses TRA (18x525) (18x285) Grad school 1.150 Post-docs 2.000 2.500 Mobility .625 .400 Project funding 4.800 3.600 Management 1.575 14.350
25
Sammanträde med styrelsen Dagordning
Föredragningslista Utseende av justeringsman Föregående mötesprotokoll, bifogas Information Nya projekt Pilotprojekt - VINNOVA/VR Postdocs Gästforskare Forskarskolan Workshops Nya hemsidan Kommunikationsplan SAB mötet ACCESS projekt – status rapport Budget 2009 Ny föreståndare Övrigt Nästa möte, tisdag 9.30, 10 februari, 2009.
Liknande presentationer
© 2024 SlidePlayer.se Inc.
All rights reserved.